24/7 Military Space News





. Armenia to build new depot for nuclear waste
YEREVAN (AFP) May 25, 2005
The Armenian parliament on Wednesday approved the construction of a new storage site for nuclear waste from the Metsamor power station, which will be operational for 50 years.

The waste depot will be built in three stages, starting in 2007, and cost about 10 million euros (12.6 million dollars), according to the Armenian energy minister, Armen Movsissian.

The first waste storage site, built in 2000 by the French company Framatome, is full.

Armenia has rejected calls from the European Union to close its only nuclear power plant, which supplies 40 percent of the country's energy needs.

The Metsamor plant built in 1977 had to be shut down in 1988 when an earthquake devastated Armenia. The plant was reopened in 1995.

All rights reserved. © 2005 Agence France-Presse. Sections of the information displayed on this page (dispatches, photographs, logos) are protected by intellectual property rights owned by Agence France-Presse. As a consequence, you may not copy, reproduce, modify, transmit, publish, display or in any way commercially exploit any of the content of this section without the prior written consent of Agence France-Presse.

.
Get Our Free Newsletters Via Email