WATER WORLD
Iraq awards Italy's Trevi contract to fix imperilled dam
By W.G. Dunlop
Baghdad (AFP) Feb 2, 2016


Iraq said Tuesday that Italian firm Trevi will repair and maintain the country's largest dam, which is in danger of a catastrophic collapse that would devastate areas to the south.

The Mosul Dam was built on an unstable foundation that continuously erodes, and a lapse in maintenance after the Islamic State jihadist group seized it in 2014 weakened the already flawed structure.

The dam has long been in danger of collapse, an event US officials have warned could send a huge wave crashing into IS-held Mosul, Iraq's second-largest city, about 40 kilometres (25 miles) away.

The Iraqi cabinet awarded Trevi the contract "to carry out the project of rehabilitating and maintaining the Mosul Dam," a government statement said.

The deal has yet to be signed, according to the statement, which did not specify how much Trevi would be paid for the work.

Italian Foreign Minister Paolo Gentiloni confirmed that the contract was awarded to Trevi.

"I think the contract will be signed in the next few days," he said in Rome.

Gentiloni said contributions by the United States and other anti-IS coalition members, along with the rules governing the deployment of Italian troops to protect the work site, "will have to be determined together with the coalition and the Baghdad government."

Italian Prime Minister Matteo Renzi said in December his country would send 450 troops to defend the dam, a decision linked to Trevi's interest in the project.

Italian forces are already in Iraq training police as part of international efforts to counter IS.

Italy also deployed forces to Iraq in 2003, and a bombing south of Baghdad killed 19 Italians in November of that year, the worst single attack on the country's forces since World War II.

- World's most dangerous dam -

Lieutenant General Sean MacFarland, the commander of the military operation against IS, said last week that the US had put measuring devices on the dam to monitor how much it is "moving or deteriorating over time".

If it does collapse, "it's gonna go fast," MacFarland said, adding that: "If this dam was in the United States... we would have taken that dam out of commission."

The dam stretches for more than three kilometres (two miles), holding back a huge winding reservoir fed by the Tigris River.

Since the dam's completion in 1984, the Iraqi government has sought to shore up the foundation by injecting mortar-like grout into the subsoil and cavities and controlling seepage, but this stopped in 2014 when IS briefly seized the structure.

Now, grouting work has resumed in the long, damp tunnel that stretches under the dam.

"Maintenance work is going on 24 hours" per day, with workers operating in three shifts, Riyadh Ezzedine al-Nuaimi, the dam's manager, told AFP.

Hussein Hamad Ahmed, an engineer at the dam, said workers drill down from the tunnel to a specific point, after which grout is pumped in to fill gaps that develop under the structure.

In 2007, the US ambassador to Iraq and the top American military commander in the country wrote a letter warning that the dam could fail with devastating results.

"A catastrophic failure of the Mosul Dam would result in flooding along the Tigris River all the way to Baghdad," the letter said.

"Assuming a worst case scenario, an instantaneous failure of Mosul Dam filled to its maximum operating level could result in a flood wave 20 metres (66 feet) deep at the city of Mosul," it said.

The US Army Corps of Engineers has said that "in terms of internal erosion potential of the foundation, Mosul dam is the most dangerous dam in the world."

.


Related Links
Water News - Science, Technology and Politics






Comment on this article via your Facebook, Yahoo, AOL, Hotmail login.

Share this article via these popular social media networks
del.icio.usdel.icio.us DiggDigg RedditReddit GoogleGoogle

Previous Report
WATER WORLD
US monitoring Iraq's largest dam for signs of collapse
Baghdad (AFP) Jan 28, 2016
The United States is monitoring Iraq's largest dam for signs of further deterioration that could point to an impending catastrophic collapse, US army officers said on Thursday. The Islamic State (IS) jihadist group seized the Mosul Dam briefly in 2014, leading to a lapse in maintenance that weakened an already flawed structure, and Baghdad is seeking a company to make repairs. "The likel ... read more


WATER WORLD
SBIRS Full Constellation testing going well

SBIRS ground system celebrates final development capstone

South Korea, Japan Should Host US THAAD Missiles: Cohen

Aegis Combat System upgrade gets Navy approval

WATER WORLD
Raytheon to research tactical missile capabilities

US says stands by Iran missile sanctions

Pakistan test-launches homegrown cruise missile: military

Orbital ATK producing alternative rocket warhead

WATER WORLD
Air Force orders more Predator/Reaper training simulators

U.S. drone Gray Eagle to be deployed in South Korea

Textron Systems to supply Shadow UAV for U.S. Army

Absolute Anti-Drone Shield? Company Creates UAV-Killing System

WATER WORLD
Harris wins place on military communications contract

General Dynamics MUOS-Manpack radio supports government testing of MUOS network

Raytheon to produce, test Navy Multiband Terminals

ADS to build one of two satellites for future COMSAT NG system

WATER WORLD
Lockheed Martin, AEC Sniper ATP center opens in Saudi Arabia

Denmark orders hundreds of Piranha 5 armored vehicles

Jordan to purchase Arlan armored vehicles from Kazakhstan

Navy successfully tests new system for unmanned vehicles

WATER WORLD
Engility continues DOD classified engineering, intel support

Lockheed Martin to separate, combine businesses with Leidos

French, Indian leaders bid to shore up fighter deal

Russia touts military aircraft, weapons

WATER WORLD
German military overstretched: commissioner

India marks Republic Day with camels and stunt-riders

Lithuania, Poland, Ukraine to launch joint brigade in 2017

Why does China need its mysterious new combat force

WATER WORLD
Nano-coating makes coaxial cables lighter

Acoustic tweezers moves cells in three dimensions, builds structures

Reconfigurable origami tubes could find antenna, microfluidic uses

Nanoribbons show 'topological' transport, potential for new technologies