SpaceWar.com - Your World At War
Nuclear fuel removed from crippled Japan plant
Tokyo, April 15 (AFP) Apr 15, 2019
The operator of Japan's crippled Fukushima power plant on Monday began removing atomic fuel from inside a building housing one of the reactors that melted down in 2011.

The delicate operation represents the first time the Tokyo Electric Power Co (TEPCO) has pulled out fuel from inside a highly contaminated building containing the melted-down reactor, and comes four years behind schedule.

Due to high radiation levels, technicians used remote-controlled equipment to haul fuel from a "storage pool" inside the building.

Operations were briefly suspended early Monday afternoon after a problem with the equipment removing the fuel, but resumed shortly afterwards.

TEPCO estimates it will take two years to remove 566 units of nuclear fuel, most of which are already spent.

Engineers have had to contend with clearing earthquake debris inside the building and an array of other technical challenges, said TEPCO spokeswoman Yuka Matsubara.

"We had to proceed carefully (to remove debris), and we needed to take measures as dust would waft up and increase radiation readings," she told AFP.

TEPCO engineers will not yet attempt to extract molten nuclear fuel that remains deep inside the mangled reactor. This is considered the most difficult part of the massive clean-up operation and is not expected to begin until 2021.

In February, TEPCO sent a remote-controlled probe to pick up pebble-sized pieces of the melted fuel in a bid to find out whether the material could be moved.

The next step in that painstaking process will be to remove some of the fuel as a sample, which is scheduled to happen by March 2020.

The company also faces other difficult challenges, including working out how to dispose of large quantities of contaminated water stored in containers at the plant site.

In the worst nuclear disaster since Chernobyl in 1986, reactors one, two and three at the Fukushima Daiichi power plant melted down after a deadly earthquake and tsunami that struck Japan in 2011.

The tsunami killed around 18,000 people and caused widespread devastation, and the nuclear meltdown forced the evacuation of areas near the plant.

Reactors four through six were offline at the time of the disaster for inspections and did not suffer meltdowns, though reactor four was damaged by an explosion in the days after the tsunami.

In December 2014, TEPCO finished removing all 1,535 units of nuclear fuel kept inside the storage pool at reactor four.

The company aims to conduct the same operations for the buildings for reactor one and two by 2023 as part of a four-decade plan to dismantle the entire Fukushima plant.

Japan's government has pushed a reconstruction plan for the surrounding region that includes decontaminating affected areas and removing topsoil.

This month, an evacuation order was lifted for part of Okuma, one of two towns where the nuclear plant is located.

But regions affected by the disaster have struggled to attract back residents who fled in the wake of the meltdown, with many still concerned about radiation despite government assurances.


ADVERTISEMENT




Space News from SpaceDaily.com
NASA raises chance for asteroid to hit moon
Tidal forces from the Sun may have shaped Mercury's tectonic features
Thick Martian clays may have formed in stable ancient lakebeds

24/7 Energy News Coverage
Israeli army says struck ' inactive nuclear reactor' in Iran's Arak
New Zealand targets leadership in superconducting space tech with new research alliance
ICEYE radar imaging added to SkyFi satellite data platform

Military Space News, Nuclear Weapons, Missile Defense
Trump says US launched 'very successful' attack on Iran nuclear sites
Axient joins Space Force STEP 20 initiative to drive next generation orbital tech
Trump 'Golden Dome' plan tricky and expensive: experts

24/7 News Coverage
NASA scientists find ties between Earth's oxygen and magnetic field
How did life survive 'Snowball Earth'? In ponds, study suggests
Arctic warming spurs growth of carbon-soaking peatlands



All rights reserved. Copyright Agence France-Presse. Sections of the information displayed on this page (dispatches, photographs, logos) are protected by intellectual property rights owned by Agence France-Presse. As a consequence, you may not copy, reproduce, modify, transmit, publish, display or in any way commercially exploit any of the content of this section without the prior written consent of Agence France-Presse.